Pond Maintenance Projects

NOTICE:

Association Board and residents have observed damage to various ponds made by ATVs (four-wheelers, dirt motorcycles, etc) and children digging on the pond floor.  The Association would like to remind all residents and guests that ATVs are not permitted in the ponds at any time (including on the banks, in dry areas of the pond or the surrounding grassy areas)!  Also, digging up vegetation/grass and/or creating holes on the pond floor is not permitted. 

These acts will not be tolerated.  Pasco County Sheriffs Office has been notified and is routinely monitoring the ponds. 

Please be aware that all damage, like done in these careless instances, shall come from your funds as paid to the Association.  If you are sighted and identified, repair costs will be billed to you.  Please assist the Association by immediately reporting these matters to the Pasco County Sheriffs Office (813) 929-1204 and the Association at (813) 448-3841. 

Pond Maintenance Schedule

·        Maintenance repairs for Pond 150 - Project scope: Re-grade slope and lay geotextile fabric for sod and/or riprap; install 2 ditch blocks - see contract -  Contractor: Sandstone Excavators - COMPLETED June 2010

·        Review erosion around Pond 111 culvert - Project scope: Reviewed by Landscaper and April Baughn (HOA Pres); no work required, but will continue to monitor erosion - COMPLETED June 2010

·        Review Pond 40 rill forming on north bank - Project scope: fill with dirt and sod - Contractor: Sandstone Excavators - COMPLETED June 2010

·        Repair of Pond 130 skimmer - Project scope: reattach skimmer wall to post; Your Choice concluded no significant damage to pond bank and/or floor - COMPLETED April 2010

·        Repairs of Pond 90 - Project scope: regrade pond banks, add fill dirt, & sod; sandbags to be placed by Pasco County under drainage culverts - Contractor: Levingson Excavating, Inc. - COMPLETED September 2009

·        Repairs of Pond 150 – Project scope: excavation and fill channel; lay non-vegetative lining in the main channel where water velocities are likely to exceed 5ft/sec; place concrete boulders at foot of culvert to slow the speed of water rushing from the culvert and the water speed along the main channel; and hydroseed for grass growths and stabilization of the pond banks and channels.  - see contract, Exhibit A- Contractor: Bio Mass Tech, Inc - COMPLETED April 2009

·        Clearing and cleaning the sumps on Ponds 10, 20, 21, 30, 40, 70. These have top priority due to the SWFWMD mandated inspection that is due; Clearing and cleaning of Ponds 80, 110, 150 and 162;  Clearing and cleaning of Ponds 120 and 130 – Contractor: Scapes Environmental Group, Inc. - COMPLETED January 2008.